Publicações

2022

SANTOS, A. C. J.; CAVALCANTE, C. A. V. A study on the economic and environmental viability of second-hand items in maintenance policies. Reliability Engineering & System Safety, v. 217, p. 108133, 2022.

MELO, Y, R.; CAVALCANTE, C. A. V.; SCARF, P.; LOPES, R.S. A hybrid maintenance policy with fixed periodic structure and opportunistic replacement. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, p. 1748006X221100365, 2022.

CAVALCANTE, C. A. V.; COSTA, L.Q.; NETO, W. A. F.; ALBERTI, A. R. A study of the different relations between disruptive events and the human factor and their effects on maintenance performance. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, p. 1748006X221098568, 2022.

ALBERTI, A. R.; NETO, W. A. F.; CAVALCANTE, C. A. V.; SANTOS, A. C. J. Modelling a flexible two-phase inspection-maintenance policy for safety-critical systems considering revised and non-revised inspections. Reliability Engineering & System Safety, v. 221, p. 108309, 2022.

2021

CAVALCANTE, C. A. V.; LOPES, R. S.; SCARF, P. A. Inspection and replacement policy with a fixed periodic schedule. Reliability Engineering & System Safety, v. 208, p. 107402, 2021.

SANTOS, A. C. J.; CAVALCANTE, C. A. V.; RIBEIRO, L. F. A. The use of second-hand items based on delay time modelling. Process safety and environmental protection, v. 146, p. 118-125, 2021.

NETO, W. A. F;  CAVALCANTE, C. A.; SANTOS, A. C.; ARAÚJO, L. H.; ALBERTI, A. R.; LIMA, H. B. An inspection policy for shredder equipment used in steel production lines considering buffer level and operating time. Journal of Manufacturing Systems, v. 60, p. 640-651, 2021.

2020

SINISTERRA, Wilfrido Quiñones; CAVALCANTE, Cristiano Alexandre Virgínio. An integrated model of production scheduling and inspection planning for resumable jobs. International Journal of Production Economics, v. 227, p. 107668, 2020.

GONZÁLEZ, H.S.J.; RODRIGUES, T.F.O.; DANTAS, M.M.; CAVALCANTE, C.A.V. A dynamic inventory rationing policy for business-to-consumer e-tail stores in a supply disruption context. Computers & Industrial Engineering, v. 142, p. 106379, 2020.

SANTOS, A. C.J; CAVALCANTE, C. A.V; RIBEIRO, L. F.A. The use of second-hand items based on delay time modelling. Process Safety and Environmental Protection, 2020.

ALBERTI, A. R.; CAVALCANTE, C. A.V. A two-scale maintenance policy for protection systems subject to shocks when meeting demands. Reliability Engineering & System Safety, v. 204, p. 107118, 2020.

ALOTAIBI, N.M; CAVALCANTE, C. A. V.; LOPES, R. S.; SCARF, P.A. Preventive replacement with defaulting. IMA Journal of Management Mathematics, v. 31, Issue 4, p. 491–504, 2020.

HERNANDEZ, L.C.; GONZÁLEZ, H.S.J.; DANTAS, P.P.L.; CAVALCANTE, C.A.V. Using multi-criteria decision making for selecting picking strategies. Operational Research, p. 1-26, 2020.

2019

SCARF, PHILIP A.; CAVALCANTE, C. A. V.; LOPES, RODRIGO SAMPAIO. Delay-time modelling of a critical system subject to random inspections. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH., p.772 – 782, 2019.

CAVALCANTE, CRISTIANO A. V.; SCARF, PHILIP A.; BERRADE, M. D. Imperfect Inspection of a System With Unrevealed Failure and an Unrevealed Defective State. IEEE Transactions on Reliability., v.68, p.764 – 775, 2019.

2018

CAVALCANTE, C.A.V.; LOPES, R.S.; SCARF, P.A. A general inspection and opportunistic replacement policy for one-component systems of variable quality. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v. 266, p. 911-919, 2018.

BERRADE, M.D. ; SCARF, P.A. ; CAVALCANTE, C.A.V . Conditional inspection and maintenance of a system with two interacting components. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v. 268, p. 533-544, 2018.

ALBERTI, A. R. ; Cavalcante, C. A. V. ; SILVA, A. L. O. E. ; Scarf, Philip A. . Modelling inspection and replacement quality for a protection system. RELIABILITY ENGINEERING & SYSTEM SAFETY, v. 176, p. 145-153, 2018.

GOMES DA SILVA, JULIANNA ; LOPES, RODRIGO SAMPAIO . An integrated framework for mode failure analysis, delay time model and multi-criteria decision-making for determination of inspection intervals in complex systems. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, v. 51, p. 17-28, 2018.

2017

BERRADE, M.D. ; SCARF, P.A. ; CAVALCANTE, C.A.V. A study of postponed replacement in a delay time model. RELIABILITY ENGINEERING & SYSTEM SAFETY, v. 168, p. 70-79, 2017.

MARSARO, MÔNICA FRANK ; Cavalcante, Cristiano Alexandre Virgínio . Random preventive maintenance policy based on inspection for a multicomponent system using simulation. Eksploatacja i Niezawodnosc-Maintenance and Reliability, v. 19, p. 552-559, 2017.

DE ALMEIDA, ADIEL TEIXEIRA ; ALENCAR, MARCELO HAZIN ; GARCEZ, THALLES VITELLI ; Ferreira, Rodrigo José Pires . A systematic literature review of multicriteria and multi-objective models applied in risk management. IMA Journal of Management Mathematics, v. 28, p. 153-184, 2017.

CAVALCANTI, A. M.; Ferraz, A G ; C. M. P. dos Santos ; Ferreira, C. P. S. ; SILVA, P. H. U. S. . Aplicação do característico setorial de inovação como modelo de diagnóstico em inovação das epp que atuam no setor da indústria de reparos de automóveis. EXACTA (ONLINE), v. 15, p. 501-514, 2017.

FERREIRA, P. E. S. ; CAVALCANTI, A. M. . Modelo de Análise do Perfil do Consumidor de Produtos Orgânicos para Definição da Estratégia de Marketing. REVISTA BRASILEIRA DE ADMINISTRAÇÃO CIENTÍFICA, v. 8, p. 1551, 2017.

CAVALCANTI FILHO, A. M. ; LIMA, T. L. A. ; MARINHO, M. L. M. ; CAVALCANTI, A. M. Desenvolvimento de Tecnologia Assistiva para o Transporte Público Baseado na Percepção do Usuário. EXACTA (ONLINE), v. 5, p. 7109, 2017.

2016

Cavalcante, Cristiano Alexandre Virgínio; DO NASCIMENTO, THIAGO GOMES ; LOPES, RODRIGO SAMPAIO . Multi-attribute Utility Theory analysis for burn-in processes combined with replacement. Eksploatacja i Niezawodnosc-Maintenance and Reliability, v. 18, p. 599-605, 2016.

CAVALCANTE, C. A. V.; Alencar, M. H. ; LOPES, R. S. . Multicriteria Model to Support Maintenance Planning in Residential Complexes under Warranty. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, p. 04016110, 2016.

2015

Berrade, M.D. ; Scarf, Philip A. ; Cavalcante, Cristiano A.V. . Some Insights Into the Effect of Maintenance Quality for a Protection System. IEEE Transactions on Reliability, v. 64, p. 661-672, 2015.

ALVES, G. A. A. ; CAVALCANTE, C. A. V. ; LOPES, R. S. . Maintenance management: a study of reliability-centered maintenance for irrigation system. Applied Engineering in Agriculture, v. 31, p. 1-8, 2015.

DA SILVA, DENILSON DIMAS ; DE VASCONCELOS, NATÁLIA VELOSO CALDAS ; CAVALCANTE, CRISTIANO ALEXANDRE VIRGINIO . Multicriteria Decision Model to Support the Assignment of Storage Location of Products in a Warehouse. Mathematical Problems in Engineering (Print), v. 2015, p. 1-8, 2015.

LOPES, R. S. ; Cavalcante, Cristiano A.V. ; Alencar, M. H. . Delay-time inspection model with dimensioning maintenance teams: A study of a company leasing construction equipment. Computers & Industrial Engineering, v. 88, p. 341-349, 2015.

SILVA, A. L. O. E. ; Cavalcante, Cristiano A.V. ; DE VASCONCELOS, NATÁLIA VELOSO CALDAS . A multicriteria decision model to support the selection of suppliers of motor repair services. International Journal, Advanced Manufacturing Technology, v. na-na, p. na-na-na, 2015.

de Almeida, A. T. ; FERREIRA, R. J. P. ; CAVALCANTE, C. A. V. . A review of the use of multicriteria and multi-objective models in maintenance and reliability. IMA Journal of Management Mathematics, v. 26, p. 249-271, 2015.

LOPES, R. S. ; CAVALCANTE, C. A. V. . Multi-criteria model to support the definition of opportunistic maintenance policy: A study in a cogeneration system. Energy (Oxford), v. 80, p. 32-40, 2015.

SOBRAL, M. F. F. ; CAVALCANTI, A. M. ; CABRAL, R. M. ; MOUTINHO, L. M. G. ; MORAES FILHO, R. A. . Estudo de caso sobre o uso do controle da qualidade em uma indústria do setor de petróleo e gás. Exacta (São Paulo. Impresso), v. 13, p. 13/5279-25, 2015.

CAVALCANTI, A. M.; CAVALCANTI FILHO, A. M. ; FORTES, G. P. ; SOUZA NETO, J. K. ; PEREIRA, L. S. . Análise da qualidade do ar interior sob a abordagem da manutenção preditiva e da inovação. Exacta Revista do Departamento de Ciências Exatas e Tecnológicas do Uni BH, v. 13, p. 45-54, 2015.

CAVALCANTI, A. M.; SANTOS, F. F. R. ; CERQUEIRA, J. A. ; NERY, E. G. ; BARROS, C. M. D. A. . Diagnóstico da indústria de confecções a partir do radar e característico de inovação. Exacta (Online), v. 13, p. 367/5272-386, 2015.

DE BARROS JERÔNIMO, TACIANA ; VALENTE DE QUEIROZ, BRUNA ; DA SILVA, CARLA FERNANDA ; DA SILVA NOGUEIRA, PATRÍCIA ; MARQUES CAVALCANTI, ANDRÉ . Inovando a estratégia de gestão da qualidade pelo uso do Desdobramento da Função Qualidade combinado com SERVPERF em empresas de prestação de serviços. Exacta (Online), v. 13, p. 167/5339-176, 2015.

2014

Cavalcante, C. A. V.; LOPES, R. S. . Opportunistic Maintenance Policy for a System with Hidden Failures: A Multicriteria Approach Applied to an Emergency Diesel Generator. Mathematical Problems in Engineering (Online), v. 2014, p. Article ID 1572, 2014.

Fontana, Marecele Elisa ; Cavalcante, Cristiano A.V. . Using the Efficient Frontier to Obtain the Best Solution for the Storage Location Assignment Problem. Mathematical Problems in Engineering (Print), v. 2014, p. 1-10, 2014.

GARCEZ, THALLES VITELLI; DE ALMEIDA, A. T. . A risk measurement tool for an underground electricity distribution system considering the consequences and uncertainties of manhole events. Reliability Engineering & Systems Safety, v. 124, p. 68-80, 2014.

GARCEZ, THALLES V.; SZUFEL, PRZEMYSLAW . Multidimensional Risk Management for Underground Electricity Networks. Studies in Logic, Grammar and Rhetoric, v. 37, p. 51-69, 2014

GARCEZ, T. V.; DE ALMEIDA, A. T. . Multidimensional Risk Assessment of Manhole Events as a Decision Tool for Ranking the Vaults of an Underground Electricity Distribution System. IEEE Transactions on Power Delivery, v. 29, p. 624-632, 2014.

CAVALCANTI, A. M.; AQUINO, J. T. ; MECCHI, T. M. L. . Analise da percepção dos usuários dos serviços oferecidos pelas companhias aéreas sob a ótica do modelo SERVQUAL. Exacta (São Paulo. Impresso), v. 11, p. 249/4404-258, 2014.

CAVALCANTI, A. M.; MARQUES, D. B. ; PAIVA JR., F. G. ; OLIVEIRA, M. R. G. . MENSURANDO A INOVAÇÃO POR MEIO DO GRAU DE INOVAÇÃO SETORIAL E DO CARACTERÍSTICO SETORIAL DE INOVAÇÃO. RAI : Revista de Administração e Inovação, v. 11, p. 115-137, 2014.

CAVALCANTI, A. M.; CAVALCANTI FILHO, A. M. ; dos Santos, C. M. P. ; SILVEIRA, D. S. ; OLIVEIRA, M. R. G. . Modelo de seleção de características das tecnologias capazes de inovação em TIC. Exacta (São Paulo. Impresso), v. 12, p. 69/4889-82, 2014.

CAVALCANTI, ANDRE M.; MOUTINHO, L. M. G. ; CABRAL, R. M. ; TORRES, T. C. ; PEREIRA, L. S. . Análise do impacto da localização e das variáveis exógenas na formação de grupos de inovação. Exacta (Online), v. 12, p. 219/5198-228, 2014.

CAVALCANTI, A. M.; PEREIRA, L. S. ; PEREIRA, L. S. ; CAVALCANTI FILHO, A. M. ; TORRES, T. C. . A STRATEGICAL APPROACH ON HOSPITAL MANAGEMENT UNDER LEAN SIX SIGMA METHODOLY VIEW. Business Management Review (BMR), v. 4, p. 216-225, 2014.

CAVALCANTI, A. M.; PINTO, F. C. ; SILVEIRA, D. S. . DIAGNÓSTICO DAS PESQUISAS SOBRE TRANSPARÊNCIA DE INFORMAÇÕES DO SETOR PÚBLICO BRASILEIRO. Revista Brasileira de Administração Científica, v. 5, p. 120, 2014.

2013

Berrade, M.D. ; Cavalcante, C. A. V. ; Scarf. P. A . Modelling imperfect inspection over a finite horizon. Reliability Engineering & Systems Safety, v. 111, p. 18-29, 2013.

Fontana, Marecele Elisa ; Cavalcante, Cristiano A.V. . Electre tri method used to storage location assignment into categories. Pesquisa Operacional (Impresso), v. 33, p. 283-303, 2013.

HORENBEEK, A. V. ; Scarf. P. A ; CAVALCANTE, C. A. V. ; PINTELON, L. . The Effect of Maintenance Quality on Spare Parts Inventory for a Fleet of Assets. IEEE Transactions on Reliability, v. 62, p. 596-607, 2013.

Berrade, M.D. ; Scarf, Philip A. ; Cavalcante, C. A. V. ; Dwight, Richard A. . Imperfect inspection and replacement of a system with a defective state: A cost and reliability analysis. Reliability Engineering & Systems Safety, p. 80-87, 2013.

FONTANA, MARCELE ELISA ; Cavalcante, Cristiano Alexandre Virgínio . Índices baseados no número de clientes para localização de itens em armazéns. Produção (São Paulo. Impresso), v. 23, p. 561-569, 2013.

FONTANA, MARCELE ELISA ; Cavalcante, Cristiano Alexandre Virgínio . Use of Promethee method to determine the best alternative for warehouse storage location assignment. International Journal, Advanced Manufacturing Technology, v. 70, p. 1615-1624, 2013.

LIMA JUNIOR, M. P. ; FERREIRA, R. J. P. . Algoritmo para seleção discreta de lotes de ativos com base em Busca Tabu. Pesquisa Operacional para o Desenvolvimento, v. 5, p. 113-135, 2013.

2012

Scarf, Philip A. ; Cavalcante, Cristiano A. V. . Modelling quality in replacement and inspection maintenance. International Journal of Production Economics, v. 135, p. 372-381, 2012.

Berrade, M.D. ; Cavalcante, Cristiano A. V. ; Scarf. P. A . Maintenance scheduling of a protection system subject to imperfect inspection and replacement. European Journal of Operational Research, v. 218, p. 716-725, 2012.

Cavalcanti Filho, André Marques ; OLIVEIRA, MARCOS ROBERTO GOIS DE ; CAVALCANTI, ANDRE MARQUES . Análise do desempenho em inovação das micro e pequenas empresas de tic em Pernambuco. Revista Brasileira de Administração Científica, v. 3, p. 7-11, 2012.

OLIVEIRA, M. R. G. ; MARQUES, D. B. ; CAVALCANTI, A. M. . AÇÃO PROPULSORA DA INOVAÇÃO: UMA ANÁLISE DO PROJETO DOS AGENTES LOCAIS DE INOVAÇÃO NO ESTADO DE PERNAMBUCO. Gestão Pública: Práticas e Desafios, v. 3, p. 78, 2012.

2011

Cavalcante, Cristiano A.V.; Scarf, Philip A. ; de Almeida, Adiel T. . A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime. Reliability Engineering & Systems Safety, v. 96, p. 627-635, 2011.

2010

MORAIS, Danielle Costa ; CAVALCANTE, C. A. V. ; ALMEIDA, Adiel Teixeira de . Priorização de Áreas de Controle de Perdas Em Redes de Distribuição de Água. Pesquisa Operacional (Impresso), v. 30, p. 15-32, 2010.

Scarf, Philip A. ; Cavalcante, Cristiano A.V. . Hybrid block replacement and inspection policies for a multi-component system with heterogeneous component lives. European Journal of Operational Research, v. 206, p. 384-394, 2010.

 Cavalcante, C. A. V.; Pires Ferreira, R. J. ; de Almeida, A. T. . A preventive maintenance decision model based on multicriteria method PROMETHEE II integrated with Bayesian approach. IMA Journal of Management Mathematics (Print), v. 21, p. 333-348, 2010.

FERREIRA, R. J. P.; ALMEIDA, A. T. ; FERREIRA, Heldemarcio Leite . Multi-Attribute P-Median Model for Location of Back-up Transformers. Brazilian Journal of Operations and Production Management, v. 7, p. 09-28, 2010.

2009, 2008, …

ALBUQUERQUE, Leonardo Lins de ; ALMEIDA, Adiel Teixeira de ; Cavalcante, Cristiano Alexandre Virgínio . Aplicabilidade da programação matemática multiobjetivo no planejamento da expansão de longo prazo da geração no Brasil. Pesquisa Operacional, v. 29, p. 153-177, 2009.

Ferreira, Rodrigo J.P. ; de Almeida, Adiel Teixeira ; CAVALCANTE, C. A. V. . A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis. Reliability Engineering & Systems Safety, v. 94, p. 905-912, 2009.

Scarf, Philip A. ; Cavalcante, Cristiano A. V. ; Dwight, Richard A. ; Gordon, Peter . An Age-Based Inspection and Replacement Policy for Heterogeneous Components. IEEE Transactions on Reliability, v. 58, p. 641-648, 2009.

Ferreira, Rodrigo José Pires; ALMEIDA FILHO, Adiel Teixeira de ; SOUZA, Fernando Menezes Campello de . A decision model for portfolio selection. Pesquisa Operacional (Impresso), v. 29, p. 403-417, 2009.

CAVALCANTE, C. A. V.; ALMEIDA, Adiel Teixeira de . A Multicriteria Decision Aiding Model Using PROMETHEE III for Preventive Maintenance Planning Under Uncertain Conditions.. Journal of Quality in Maintenance Engineering, v. 13, p. 385-397, 2007.

CAVALCANTE, C. A. V.; COSTA, Ana Paula Cabral Seixas . MULTICRITERIA MODEL OF PREVENTIVE MAINTENANCE.. Brazilian Journal of Operations and Production Management, v. 3, p. 57-72, 2006.

Cavalcante, Cristiano Alexandre Virgínio; ALMEIDA, Adiel Teixeira de . Modelo multicritério de apoio a decisão para o planejamento de manutenção preventiva utilizando PROMETHEE II em situações de incerteza. Pesquisa Operacional, v. 25, n.2, p. 279-296, 2005.

ALMEIDA FILHO, Adiel Teixeira de ; CAVALCANTE, C. A. V. ; COSTA, Ana Paula Cabral Seixas. Multicriteria Decision Making on Selection of Decision Analysis Software. Journal of Academy of Business and Economics, v. V, n.3, p. 11-17, 2005.

MIRANDA, Caroline Maria Guerra de; FERREIRA, R. J. P. ; GUSMÃO, Ana Paula Henriques de; ALMEIDA, Adiel Teixeira de . SISTEMA DE APOIO A DECISÃO PARA SELEÇÃO DE ATIVIDADES CRÍTICAS NO GERENCIAMENTO DE PROJETOS COM AVALIAÇÃO MULTICRITÉRIO. Revista Produção Online, www.producaoonline.inf.br, v. 3, n.4, 2003.